Our team mobilized quickly to transport a backup transformer across the job site so a crane crew could install the replacement inside the substation. Once power was restored, we loaded the failed transformer and transported it back across the mine, where it was safely unloaded onto a skid for inspection and repair.
Projects like this require careful planning, specialized heavy haul equipment, and close coordination between multiple crewsβall while working safely in an active industrial environment.
Project Scope
- Emergency response to transformer failure
- Heavy haul transportation of replacement transformer
- Coordination with 200-ton crane operations
- Removal and transport of failed transformer
- Safe placement for repair and refurbishment
At JP Technical Services, we understand that unexpected equipment failures can have a significant impact on production. Our team is equipped to respond quickly with the transportation, rigging support, and field expertise needed to minimize downtime and keep operations moving.